After finishing the basic frame, I moved on to gluing on the cladding. I used 9.5mm x 3mm x 915mm balsa sticks cut to length and glued them on using a spare piece of balsa as a spacer. I also allowed for an extra centimetre in hight, as I will be adding a false roof later, to hide wiring from the lighting.
{Forgive the before photos as I had started painting before I remembered to take pics ;-) }
After the glue had dried, I spray painted the exterior with Rustoleum 2X paint + primer in matte Carbon Black (which I had on hand after painting some chairs).
{Yes I will cut that piece in the middle of the second window out when I finish the cladding off!}
As you can see, despite being careful, I still managed to get some drips!! Nothing that a light sanding and a second coat didn't get rid of however ;-)
No comments:
Post a Comment